Frankie picked up his paint from Chris Morrison and Yvonne Mecalis in Harbor City. We were in the throes of final assembly. The first thing we needed to do before we could begin assembly included installing the wire loom we removed so Doctor John could straighten the frame.
We used a compressor to blow a length of cord down the backbone and pull the wire loom forward for the front end. That was an interesting exercise, and we took care and concern not to overdo it and damage any wires. We ran looms along the bottom of the frame to the regulator, the crank position sensor and over the engine to the EFI for the coil and the throttle body, plus the horn, which would be replaced with the Love Jugs Mini cooling system.